No Result
View All Result
The Biz Reporter
 
English Edition
Sunday, June 14, 2026 | 12:41 AM
Print Edition
  • Login
  • Home
  • LatestLive
  • Lead Story
  • News
  • Business
  • Education
  • Finance
  • Food
  • Jobs
  • Opinion
  • Policies
  • Science & Tech
  • Sports
  • Travel
The Biz Reporter
No Result
View All Result
The Biz Reporter
No Result
View All Result
Home Lead Story

Trial run of Vande Bharat train from Katra to Srinagar conducted successfully

by Editor Desk
January 25, 2025
in Lead Story
0
No Direct Delhi-Srinagar Train: 15-Hour Journey With Mandatory Katra Stop
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Srinagar — Years of hard work and dedication, and some engineering marvels later, the dream of Kashmir to be connected by rail finally came to fruition after a specially-designed Vande Bharat Express train arrived in the city on Saturday, completing its trial run.

The train, on its maiden trial run, arrived at Srinagar station in the Nowgam area on the city’s outskirts from Katra in Jammu.

It reached Jammu on Friday.

As the Vande Bharat Express reached the station at 11:30 am, it was welcomed with slogans and praises for the Indian Railways.

A large number of people and railway officials were waiting for the train since the morning, many of them carrying garlands to welcome the officials on board the train.

After a brief half at the station here, the train moved to the Budgam station to complete its trial run.

“The first trial run of the Vande Bharat between Katra and Kashmir was completed successfully,” an official said.

The train is specially designed to operate seamlessly in Jammu and Kashmir’s challenging winter conditions.

Prime Minister Narendra Modi is expected to flag off the train from Katra, as the commissioner of railway safety has given the green signal for running the train service on the Katra-Baramulla section. The date of the flagging-off ceremony is yet to be announced.

The railways has completed 272 kilometres of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.

According to railway officials, the Railway Board, on June 8 last year, unveiled a Vande Bharat Express train specially designed to operate seamlessly in Jammu and Kashmir’s challenging winter conditions for the upcoming Katra-Srinagar rail route. The train incorporates special climate-related features.

Compared to the other 136 Vande Bharat Express trains running in different parts of the country, this train has several additional features to meet operational challenges and passengers’ needs in the extreme weather conditions of Jammu and Kashmir.

It includes advanced heating systems that prevent the freezing of water and bio-toilet tanks, provide warm air for the vacuum system and ensure optimal functioning of the air-brake system for smooth operations even in sub-zero temperatures.

The train also features embedded heating elements in the windshield to automatically defrost the driver’s front lookout glass, ensuring clear visibility in harsh winter conditions.

In addition to these climate-related features, it includes all other amenities of the existing Vande Bharat trains — fully air-conditioned coaches, automatic plug doors, mobile charging sockets and the likes.

By enhancing the Kashmir valley’s connectivity to the national railway network, this train symbolises India’s commitment to bridging geographical and economic gaps, the officials said.

The approval by the commissioner of railway safety marks a significant step towards completing the 272-km USBRL project, which aims at connecting the Kashmir valley to the broader Indian Railway network.

Over the last month, the Indian Railways has conducted six trial runs on various sections of the track, including crucial milestones such as the country’s first cable-stayed rail bridge, the Anji Khad bridge, and the iconic arch bridge over the Chenab river at Kauri.

The Anji Khad bridge, a critical part of the USBRL project, is an engineering achievement, featuring a single pylon rising 331 metres above the river bed. The pylon, which took several years to complete, now rises 191 metres above its foundation level.

With a total length of 473.25 metres, the Anji Khad bridge is one of the two highest railway bridges in the world, alongside the Chenab bridge at Kauri, which holds the title of the world’s highest railway bridge at 359 metres above the river bed, 35 metres taller than the Eiffel Tower in Paris. — (PTI)

Editor Desk

Editor Desk

Next Post
KCCI’s GST hike concerns on Kashmiri shawls gains strong backing from Parliamentary Panel

KCCI demands action: Stop the Airfare Extortion in Kashmir

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Trending on Biz Reporter

Plugin Install : Popular Post Widget need JNews - View Counter to be installed
  • About
  • Advertise
  • Careers
  • Contact
For Content related questions. editor@thebizreporter.com

©2022 The Biz Reporter - Hosted by LineageHost

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Latest
  • Lead Story
  • News
  • Business
  • Education
  • Finance
  • Food
  • Jobs
  • Opinion
  • Policies
  • Science & Tech
  • Sports
  • Travel

©2022 The Biz Reporter - Hosted by LineageHost