No Result
View All Result
The Biz Reporter
 
English Edition
Sunday, June 14, 2026 | 10:26 AM
Print Edition
  • Login
  • Home
  • LatestLive
  • Lead Story
  • News
  • Business
  • Education
  • Finance
  • Food
  • Jobs
  • Opinion
  • Policies
  • Science & Tech
  • Sports
  • Travel
The Biz Reporter
No Result
View All Result
The Biz Reporter
No Result
View All Result
Home Latest

Massive drop in river water levels causing power deficit: Govt

by Editor Desk
October 20, 2023
in Latest
0
Massive drop in river water levels causing power deficit: Govt
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Srinagar: A massive decline in river water level has caused a major power deficit in Jammu and Kashmir.

Despite the decline in water levels, the Power Development Department (PDD) is supplying 2200 MWs of power against the availability of 1400 MWs. The government is procuring 700 MWs through power exchange.

Of the total power distribution, the government is supplying 1200 MWs to Kashmir and 1000 MWs to the Jammu region.

Addressing a press conference at Raj Bhawan here, Principal Secretary PDD H Rajesh Prasad said that this year, there has been a drastic decline in the water level of rivers and streams in J&K. “This resulted in a huge dip in the local power generation in the UT.

“In June-July, our generation would remain between 1000 MWs to 1050 MWs. In September this year, power generation went down to 750 MWs and in October it reduced to 250 MWs only,” said Prasad with Lieutenant Governor Manoj Sinha in tow.

He said that the Power department is still supplying power at a subsidized rate per unit to consumers.

About the curtailment in metered and non-metered areas, the Secretary PDD said that in the peak winter season, they will get additional power quota and the flow of same has started. “We will be utilizing the additional power quota in winters when demand reaches peak,” he said. 

He said that in the next three to five years, Transmission and Distribution losses would be reduced to 20 percent. “The system has been augmented and the process is on. We will be able to reduce the power T&D losses to 20 percent in the next few years,” he said.

Editor Desk

Editor Desk

Next Post
2 matches played on Day 3 of Khadija Memorial Cricket Cup-2023

2 matches played on Day 3 of Khadija Memorial Cricket Cup-2023

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Trending on Biz Reporter

Plugin Install : Popular Post Widget need JNews - View Counter to be installed
  • About
  • Advertise
  • Careers
  • Contact
For Content related questions. editor@thebizreporter.com

©2022 The Biz Reporter - Hosted by LineageHost

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Latest
  • Lead Story
  • News
  • Business
  • Education
  • Finance
  • Food
  • Jobs
  • Opinion
  • Policies
  • Science & Tech
  • Sports
  • Travel

©2022 The Biz Reporter - Hosted by LineageHost